LA Smart Home Systems
← All service areas

Serving Pacific Palisades

Smart home and AV installation in Pacific Palisades

On a Palisades rebuild there's one stage, after framing and before drywall, when cable can go anywhere. We plan the network, lighting control, shades, audio and cameras with your architect and builder so it's in the wall by then. If your house is still standing, we retrofit it instead.

  • Low-voltage plans drawn with your architect before framing
  • Conduit to gates and door stations on canyon and bluff streets
  • Motorized shades for the glass that faces the ocean
  • Retrofits for 1920s plaster and glass-walled modern houses

Free consultation · Pacific Palisades

Rebuild or retrofit? Tell us about the house

We respond within 2 hours during business hours. No spam, no aggressive sales calls.

Licensed & insured · CA Lic. #949232

What goes in the walls of a Palisades rebuild

After the January 2025 fire, many Palisades lots are being rebuilt from the ground up. Between framing and drywall, cable can go anywhere in the house. After that, every added wire is a patch.

LADBS issues the permits. As of early 2026, the City's like-for-like path covers rebuilds within 110 percent of the old footprint and height. The low-voltage plan belongs on the same drawings as the electrical:

  • A ventilated spot for the equipment rack, on its own circuit
  • Network cable to every TV, desk and ceiling access point
  • Speaker wire to each room and patio that will have music
  • Shade wiring at the windows that face the ocean
  • Conduit to the gate, the front door and each camera

Smart Home Installation in Pacific Palisades Multi-Room Audio in Pacific Palisades

Mesas separated by canyons, and what that does to a wiring plan

The city's historic resources survey describes the Palisades as mesas separated by canyons. Where your lot sits changes the plan.

The Alphabet Streets and the Huntington

The Alphabet Streets, north of Sunset Boulevard, date from the founding in the early 1920s and have the smallest lots in the Palisades. The Huntington Palisades followed in 1926 with wide curving drives. Where the house fills the lot, rack space gets drawn in early.

Rustic Canyon

The canyon is narrow and heavily wooded, and coastal fog is common. Outdoor cameras and speakers here sit under trees in damp air, so they get a wired run and sealed connections, not a Wi-Fi link through the foliage.

Castellammare

It was developed in the mid-1920s on the bluffs west of Santa Ynez Canyon, with stone retaining walls and steep concrete stairways. A door station and camera at the street save the climb. Near the water, salt air is hard on outdoor gear.

The Highlands

Upper Santa Ynez Canyon was master-planned starting in the 1970s, and parts of it are gated. If your tract has an association, its rules for exterior work are between you and the board.

Security Camera Installation in Pacific Palisades Control4 Installation in Pacific Palisades

Houses still standing, from 1920s plaster to steel and glass

Not every Palisades house is a rebuild. The city's 2013 survey dated the Riviera's original houses from the 1920s through the 1950s. The oldest of those usually have plaster walls, which are hard on Wi-Fi and slow to get cable through.

The Palisades has a modern streak too. Four Case Study houses were designed for one block here in the late 1940s, and City Planning's July 2025 damage review listed all four with no damage. The 2013 survey also found a cluster of 1970s Late Modern houses in Rustic Canyon. A flat roof, exposed beams and walls of glass leave no attic and few cavities. Wireless Lutron lighting control covers switches a new wire can't reach.

Home office with a slat wall and no visible wiring

Smart Lighting Installation in Pacific Palisades Smart Home Installation in Pacific Palisades

Common questions

Rebuild and retrofit questions from the Palisades

Our architect is drawing a like-for-like rebuild. What do you need from the plans?
Floor plans and the electrical layout, before it's final. We mark where the rack, keypads, speakers, shades, cameras and access points go, and your builder brings us in after framing. The free on-site consultation can happen on the lot, drawings in hand.
Besides the City, who reviews a Palisades rebuild?
City Planning's rebuild FAQ says the City doesn't enforce CC&Rs or association rules, so those are separate from your LADBS permit. The Pacific Palisades Civic League has reviewed new houses in Tract 9300 since 1943. In August 2025 it said it had suspended that review for houses damaged or destroyed in the fire. Those questions are between you and each body.
LADWP wants a conduit to the street for underground power. Does that change your work?
It's your electrician's job, and it shows why timing matters. LADWP's guidance, revised in January 2026, asks rebuilding owners for a panel that can take underground service and a 3-inch conduit to the front property line, so a later switch doesn't mean breaking up a new driveway. Low-voltage conduit to a gate follows the same logic.
Our house in the Riviera is still standing. Can you add lighting control and a monitored alarm?
Yes. Lutron control can be wireless, so plaster walls stay closed. Monitoring runs through ADT or Alarm.com. The City of Los Angeles requires an alarm permit, issued by its Office of Finance, for any alarm system. That's between you and the City.

Near Pacific Palisades

Neighboring areas we serve

Ready when you are

Talk to a real installer, same day.